What was found
FLAP OVERSPEED WITH WINDSHEAR EVENT PER CREW FLAPS AT 25 AND 31KT OVERSPEED FOLLOWED AMM 05-51-08/201. ACP'D PHASE I INSPECTION PER AMM TASK 05-51-08-212-001. INSPECTION COMPLETED, NO FINDINGS. PARTIALLY ACP'D PHASE II INSPECTION IAW TASK 05-51-08-212-007, COMPLETED SECTION D. TE FLAP INSPECTION. LE SLATS INSPECTION, SECTION F. WING L/E INSPECTION, PARAGRAPH 1 COMPLETED, , AUX ROLLERS AND MAIN STRUCTURE BOLTS UNLOCKED TO CLEAR C/W AMM 05-51-08 PHASE 2 INSPECTION . OPS CHECKS GOOD. LEFT WING, OUTBOARD SLAT #1, OUTBOARD MAIN TRACK, UPPER FWD, LOWER FWD AND LOWER AFT ROLLER BOLTS REMOVED FOR INSPECTION. ALSO OTBD MAIN TRACK & INBD MAIN TRACK TO SLAT CONNECTING BOLT REMOVED FOR INSPECTION IAW GMM 09-25-05.