What was found
BOTH CENTER FUEL PUMPS FAILED SIMULTANEOUSLY PERF CTR L AND R PUMP OPERATION. FOUND PUMPS TO OPERATE NORMAL. PERF GRND TEST AND PASSED. MX MSG CLEARED. REPLACED 3 GPMS C/W LMC. REPLACED GPM R1 REF DMC-B787-A-42-21-02-09A-921A-A SOFTWARE LOADS AND GROUND TESTS SATISFACTORY. REPLACED GPM L1 REF DMC-B787-A-42-21-02-01A-921A-A SOFTWARE LOADS AND GROUND TESTS SATISFACTORY. REPLACED GPM L6 REF DMC-B787-A-42-21-02-06A-921A-A SOFTWARE LOADS AND GROUND TESTS SATISFACTORY. ALL SOFTWARE LOADS, CONFIG CHECKS, AND GROUND TEST SATISFACTORY.