What was found
FLAPTRAILING EDGE FLAPS ASYMMETRY LANDED FLAP UP WITH LEADING ED GE EXTENDED TS AS PER FIM 32-61 TASK 815, FOR PSEU MSGS 32-62009 AND EXISTING FAULTS SHOWN ON PSEU. OVERHEAD PSEU LIGHT EXTINGUISHED. 32-62010. PSEU MSGS SELF CLEARED WHILE PERFORMING FIM TASK. SECURED FWD. EE DOOR CLOSED. VERIFIED PSEU HAS NO EXISTING FAULTS. NO FURTHER TS REQUIRED BY FIM. RAN FLAPS AND SLATS THROUGH SEVERAL UP DOWN CYCLES. NO