What was found
PER EC/RA 5360-01873 PART 1, STEP 3. INITIATE A NEW DIP LOGPAGE FOR THE INTERIM REPAIR. AT FUSELAGE STRINGER 25L, STA 807 AND 847. FUSELAGE STRINGER 25L REPAIR BETWEEN STA 807 & 847 ON AIRCRAFT 5360-01873. N37408 IN ACCORDANCE WITH PART 2 OF THE LATEST REVISION OF ECRA AFTER JUNE 30, 2026, BUT BEFORE JULY 30, 2026, PLANNING TO CONTACT ENGINEERING FOR THE INSPECTION REQUIREMENTS OF THE AFTER JUNE 30, 2026, BUT BEFORE JULY 30, 2026, PLANNING TO TOMC-APPROVAL FROM SC1ELBYC COMMENT CONTACT ENGINEERING FOR THE INSPECTION REQUIREMENTS OF THE FUSELAGE STRINGER 25L REPAIR BETWEEN STA 807 & 847 ON AIRCRAFT N37408 IN ACCORDANCE WITH PART 2 OF THE LATEST REVISION OF ECRA 5360-01873.REF LP 9445872, QC RECORDS UPDATE RECORDS UPDATE QC REVIEW T/A: PLN/ENG >30JUN26<30JUL26.....KNB REF LP 9445872