What was found
CREASE ACROSS AFT UNDERS IDE OF FUSELAGE. COMPLETED DAMAGE MAP FOR 8 EA DENTS FR 62-64 BETWEEN STR 41LH-43RH SENT TO ENG FOR SUPPORT LOCKING LOG FOR MX FERRY FOR REPAIR AT GSO PICS ADDED MEASURED GOUGE DEPTH IN DENT #1. MATERIAL LOSS IS 0.017 , PERFORMED A 10X VISUAL INSPECTION. FOUND ONE PIT DEPTH 0.010 NO VISUAL INDICATIONS OF A CRACK PER SRM 51-10-00 AND SRM 53-41-11-283-001 UNLOCKED, AC NOW IN GSO. ACCOMPLISHED ECRA 5341-01472 PART 1 INTERIM REPAIR IAW HAECO GSO REO-G25345 WITH NO DIVIATION. GENERATED DIP LOG PAGE (3572572) PER PART 1 STEP 2 AND GENERATED SECOND LOG PAGE PER PART 1 STEP 3.