What was found
RII INSPECTION REQUIRED DURING DVI OF STRUT #2 FIRE SEAL AND FIREWALL - TOP SURFACE INSPECTION WAS OBSERVED CRACK ON NACELLE STRUT FWD UPPER SURFACE. ACCOMPLISHED ALL EC/RA# 5451-01467 STEPS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RII INSPECTION REQUIRED DURING DVI OF STRUT #2 FIRE SEAL AND FIREWALL - TOP SURFACE INSPECTION WAS OBSERVED CRACK ON NACELLE STRUT FWD UPPER SURFACE. ACCOMPLISHED ALL EC/RA# 5451-01467 STEPS.