What was found
PSU 47JKL FOUND BLINKING DURING OXYGEN 3R TEST. INITIATOR REPLACED IAW CMM 35-22-29 & INSTALLATION TEST C/OUT FOUND SATISFACTORY IAW AMM 35-21-00.REFER EC/RA #3520-01774 FOR INITIATOR REPLACEMENT.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PSU 47JKL FOUND BLINKING DURING OXYGEN 3R TEST. INITIATOR REPLACED IAW CMM 35-22-29 & INSTALLATION TEST C/OUT FOUND SATISFACTORY IAW AMM 35-21-00.REFER EC/RA #3520-01774 FOR INITIATOR REPLACEMENT.