What was found
APU AIR INLET PLENUM TRANSITION DUCT MATING SURFACE AT APU BAY BULKHEAD WAS CORRODED. ACCOMPLISHED A REPAIR AT APU AIR INLET PLENUM DUCT BULKHEAD AT BS 1088 IAW SRM 51-40-02-0G-0, ESR 29-13201, REV P1, DWG 148A0924, DWG 148A1684, AND DWG 148A3800.