What was found
RAMP REPORTED GOUGE ON FUSELAGE BY AFT SERVICE DOOR DOOR 2L, INSPECTED GOUGE AND DENT IAW SRM 51-10-02 . GOUGE AND DENT OUT OF LIMITS IAW SRM 53-00-1-1A-1. ACCOMPLISHED STEPS 4A, B, ,C, AND D OF SRM 53-80-01-2R-5, REMOVED DAMAGE & FASTENERS. REPAIR AREA REQUIRES SRM 53-80-01-2R-1 STEPS 4E PARTS 1,2, AND 3. HFEC, NDT PART 6, HOLE PROBE PROCEDURE 16, PROCEDURE 23, & PROCEDURE 3. VERIFIED STEPS 4A,B,C, & D. PERFORMED NDT PROCEDURES 3, 16, & 23 OF NDT MANUAL PART 6 51-00-00, NO DEFECTS NOTED. IAW SRM 53-80-01-2R-5 TABLE 201; -1 DOUBLER, -2 TRIPLER & -3 FILLER. VERIFIED MATERIAL FOR DOUBLER, TRIPLER, & FILLER. FABRICATED -1 DOUBLER, & -2 TRIPLER IAW SRM 53-80-01-2R-5. FABRICATED -3 FILLER, TREATED & PRIMED ALL REPAIR PARTS, & INSTALLED C/S REPAIR WASHERS, IAW SRM 53-80-01-2R-5. INSTALLED C/S REPAIR WASHERS, IAW SRM 53-80-01-2R-5. INSTALLED REPAIR PARTS IAW SRM 53-80-01-2R-5. APPLIED INTERNAL CORBAN AND RESTORED EXTERNAL FINISH IAW SRM 53-80-01-2R-5. VERIFIED APPLICATION OF INTERNAL CORBAN AND RESTORED EXTERNAL FINISH IAW SRM 53-80-01-2R-5. REPAIRED AREA IAW SRM 53-80-01-2R-5.