What was found
FIRST RIB AFT OF AFT ENG MOUNT IS CHAFED TWO SPOTS NUMBER ONE ENGINE PYLON. REMOVED DAMAGED AREA NR 1 ENGINE PYLON MOUNT RIB. FABRICATED NEW REPAIR, INSTALLED PER SRM 51-40-2 AND 51-30-2.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FIRST RIB AFT OF AFT ENG MOUNT IS CHAFED TWO SPOTS NUMBER ONE ENGINE PYLON. REMOVED DAMAGED AREA NR 1 ENGINE PYLON MOUNT RIB. FABRICATED NEW REPAIR, INSTALLED PER SRM 51-40-2 AND 51-30-2.