Service difficulty report · Line · Lear 55LEAR

Difficulty date
January 9, 2009
Submitted
January 12, 2009
Operation
Air carrier
Aircraft
N717EB
Make and model
Lear 55LEAR
Aircraft serial
55016
Aircraft time
9,971 hours, 7,125 cycles
Part
Line
Condition
Misinstalled
Location
Fuel System
Stage of operation
TO
How discovered
O
Nature of condition
J, W
Precautionary procedure
C

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

WHEN REACHING FULL POWER (APPROX 97 PERCENT N1) LT FUEL PRESSURE LIGHT ILLUMINATES. WHEN REDUCING POWER AGAIN LT FUEL PRESSURE LIGHT WENT OUT. INCREASING POWER AGAIN LIGHT WENT ON AGAIN. LIGHT DID NOT ILLUMINATE WITH STBY PUMP ON. REMOVED LT INBD WHEEL WELL FUEL PANEL. FOUND MOTIVE FLOW AND SPPR PRE-CHECK LINES TO BE SWAPPED. REMOVED AND RE-INSTALLED LINES IN CORRECT POSITION AND RE-INSTALLED PANEL. PANEL LEAK CHECK WAS SATISFACTORY AT THIS TIME. ALL WORK DONE IAW MM 28-00-00. PERFORMED FULL POWER ENGINE RUN IAW MM 28-00-00. LEAK CHECK AND OPERATIONAL CHECKS GOOD.