What was found
HEAVY CHECK COE/MAJOR REPAIR: FORWARD PRESSURE BULKHEAD HAS LEVEL 2 CORROSION AT UPPER RT OUTBOARD BONDING POINT. REPAIRED PER SRAS CETS-4463/16...10711 ISSUE B, DATED 8/9/2018.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
HEAVY CHECK COE/MAJOR REPAIR: FORWARD PRESSURE BULKHEAD HAS LEVEL 2 CORROSION AT UPPER RT OUTBOARD BONDING POINT. REPAIRED PER SRAS CETS-4463/16...10711 ISSUE B, DATED 8/9/2018.