What was found
DURING 2C INSPECTION, TASK REVEALED RIGHT MIDDLE FLOOR CROSSBEAM AT FRAME 23 TO BE CORRODED. REMOVED CROSSBEAM AND INSTALLED SERVICEABLE CROSSBEAM USING EMB SRM STANDARD PRACTICES.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 2C INSPECTION, TASK REVEALED RIGHT MIDDLE FLOOR CROSSBEAM AT FRAME 23 TO BE CORRODED. REMOVED CROSSBEAM AND INSTALLED SERVICEABLE CROSSBEAM USING EMB SRM STANDARD PRACTICES.