What was found
DURING 2C INSPECTION, TASK REVEALED RIGHT CARGO FLOOR SILL TO BE CORRODED. REMOVED SILL AND INSTALLED SERVICEABLE SILL USING EMB SRM STANDARD PRACTICES.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 2C INSPECTION, TASK REVEALED RIGHT CARGO FLOOR SILL TO BE CORRODED. REMOVED SILL AND INSTALLED SERVICEABLE SILL USING EMB SRM STANDARD PRACTICES.