What was found
NO LEFT BRAKE PRESSURE ON LANDING - PERFORMED VISUAL INSPECTION OF LH BRAKE PLUMBING CHECKING FOR LEAKS WITH NO LEAKS NOTED. VERIFIED HYDRULIC BRAKE RESERVOIR WAS FULL. BLED BRAKES IAW AMM 32-40-01 OPS CHECK GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NO LEFT BRAKE PRESSURE ON LANDING - PERFORMED VISUAL INSPECTION OF LH BRAKE PLUMBING CHECKING FOR LEAKS WITH NO LEAKS NOTED. VERIFIED HYDRULIC BRAKE RESERVOIR WAS FULL. BLED BRAKES IAW AMM 32-40-01 OPS CHECK GOOD.