What was found
DURING SCHEDULED INSPECTION, THE LT HORIZONTAL STABILIZER CENTER SKIN EXHIBITED AN NDT CRACK INDICATION. SURFACE COATINGS WERE REMOVED AND ANOTHER NDT CHECK WAS ACCOMPLISHED AND THE CRACK INDICATION WAS VERIFIED AT THE AFT INBD CORNER. THE HORIZONTAL STABILIZER WAS REPLACED IAW AMM 55-10-00-201, AND ER/A 507849-14AD, REV E STEPS 3-4.