What was found
CORROSION ON FLOORBEAM ANGLE BS 1166 AND X 54-60. FLOORBEAM ANGLE AND CORROSION REMOVED, REWORKED AREA WAS MEASURED, OUT OF LIMITS, NEW FLOORBEAM ANGLE DRILLED, TREATED, PAINTED AND INSTALLED IAW SRM 51-10-3, PARA 14, 21, 26, 38, 53-01, FIG 1 AND 51-30-5.