What was found
DAMAGE TOLERANCE EVALUATION ( DTE ) REQUIRED FOR SB MOD 53-1158 PERFORMED ON RH MLG KEEL BEAM. PER ER/A 617583-14AD REV A, DTE ACCOMPLISHED. ER/A SECTION II FOR CATEGORY C TEMPORARY REPAIR REPLACEMENT/MODIFICATION IS REQUIRED AND IS TRACKED ON NEW LOG PAGE 0602090. PLEASE CLOSE THIS LOG PAGE, 0330948.DAMAGE TOLERANCE EVALUATION ( DTE ) REQUIRED FOR SB MOD 53-1158 PERFORMED ON RH MLG KEEL BEAM. C/A: SECTION I IS LIMITED TO 182 DAYS FROM 06MAY24. ER/A TO BE REVISE D PRIOR TO THAT LIMIT ELSE REMOVE A/C FROM SERVICE. ASSOCIATED ER/A 14-617583.