What was found
AT D-CHECK, FOUND RIGHT HAND SPAR FITTING GOUGED (MLG BEAM O/B SIDE TO REAR SPAR SUPPORT FITTING). PERFORMED HFEC, BORED RT MLG SUPPORT FITTING PIN HOLE TO 1.795, WITHIN LIMITS PER BOEING TELEX 32-9430. FLAP PEENED AREA, INSTALLED BUSHINGS AND SUPPORT BEAM PIN PER MM 57-15-12.