What was found
AT C-CHECK, FWD BAGGAGE COMPARTMENT FLOOR LINING SUPPORT CRACKED 1 INCH NEAR L-33 RT STA 220.000. PERFORMED STOP DRILL IAW SRM 53-2-5, FIG 8B-1, FABRICATED AND INSTALLED DOUBLER IAW SRM 53-2-5, FIG 8B-1.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT C-CHECK, FWD BAGGAGE COMPARTMENT FLOOR LINING SUPPORT CRACKED 1 INCH NEAR L-33 RT STA 220.000. PERFORMED STOP DRILL IAW SRM 53-2-5, FIG 8B-1, FABRICATED AND INSTALLED DOUBLER IAW SRM 53-2-5, FIG 8B-1.