What was found
NR 2 PITCH TRIM INOP. DEFERRED NR 2 PITCH TRIM PER MEL 22-11-03. TRANSFERRED TO DMI LOG CONTROL 5336.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 2 PITCH TRIM INOP. DEFERRED NR 2 PITCH TRIM PER MEL 22-11-03. TRANSFERRED TO DMI LOG CONTROL 5336.