What was found
MAIN CARGO COMPT FLOOR SUPPORT CRACKED 5 IN FS 50.000 BL 10 RT. STOP DRILLED CRACK AND FABRICATED DOUBLER PER SRM 53-2-0. CLEANED,TREATED AND PRIMED PER SRM 51-1-8B. INSTALLED DOUBLER PER SRM 53-2-0.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN CARGO COMPT FLOOR SUPPORT CRACKED 5 IN FS 50.000 BL 10 RT. STOP DRILLED CRACK AND FABRICATED DOUBLER PER SRM 53-2-0. CLEANED,TREATED AND PRIMED PER SRM 51-1-8B. INSTALLED DOUBLER PER SRM 53-2-0.