What was found
NOSE SECTION INTERIOR LEFT TUNNEL CHANNEL CRACKED 2.000, STA 17.000, L32L - L35L. REMOVED CRACKED CHANNEL IAW SRM 51-1-20C AND SRM 51-1-21 PG 1. FABRICATED CHANNEL IAW SRM 51-1-4 PG 1-5, SRM 53-3-3 FIG 2. PERFORMED HEAT TREATMENT TO CHANNEL IAW SRM 51-1-1 PG 17. CLEANED, TREATED AND PRIMED CHANNEL IAW SRM 51-1-8B. INSTALLED NEW CHANNEL ON NOSE SECTION INTERIOR LEFT TUNNEL STA 17.000, L32L - L35L IAW SRM 51-1-21 PG 1 SRM 51-1-20D PG 9.