What was found
RT WING EXTENDED L/E INBD VANE FWD PLATING ELONGATED HOLES AT STA XS 247.000. PERFORMED MAJOR REPAIR. REMOVED FASTENERS. TRIMMED OUT THE DAMAGED SKIN AREA. PERFORMED NDT INSPECTION. CLEANED, TREATED AND PRIMED AREA. FABRICATED A REPAIR DOUBLER EXTERNAL DOUBLER (7075-T6 AL0.071), AN INTERNAL DOUBLER (7075-T6AL0.050) AND A FILLER (7075-T6 AL0.063). CLEANED, TREATED AND PRIMED THE EXTERNAL REPAIR DOUBLER INTERIOR SURFACE AND INTERNAL DOUBLER. APPLIED PRC SEALANT ON FAYING SURFACES. INSTALLED REPAIR EXTERNAL DOUBLER, INTERNAL DOUBLER AND FILLER ON RIGHT WING EXTENDED L/E INBD VANE FWD PLATING (AT STA XS 247.000) USING NEW FASTENERS. FOR LEAK CHECK SEE JC 8-36-00-003.