What was found
FLAPS SPLIT DURING DEPLOYMENT TO 12 PERCENT, PERFORMED ASYMMETRIC FLAP ABNORMAL PROCEDURE AND PARTIAL FLAP LANDING PROCEDURE. LANDED A/C WITH ZERO FLAPS. AFTER R/R OG LT INBD FLAP ACTUATOR, PERFORMED GOOD OPS CHECK OF FLAPS PER DC-8 M/M 27-51-9.