What was found
FWD ACCY COMPT FRAME CRACKED 3.000 AT STA 55.000 L-23L (MAJOR REPAIR). PERFORMED MAJOR REPAIR IAW SRM 53-2-0 FIG 2, TR 53-110, TR 53-125, SRM 53-3-3 FIG 3. REMOVED FASTENERS IAW SRM 51-1-20D PAGE 21, SRM 51-1-21 PG 1. CUT OUT DAMAGED SECTION AND FABRICATED NEW FRAME SEGMENT(AL 7075.0 0.071) AND SPLICE DOUBLERS 2EA (AL7075 0 0.071) IAW SRM 53-2-0 FIG 2 SHEET 5, 6, 7, 8 SRM 53-3-3 FIG 3, SRM 51-1-4 PG 1. HEAT TREATED IAW SRM 51-1-1 PG 1-13-17. PERFORMED NDT INSP IAW NDT SPM PART 06-10-01-001. NO CRACK FOUND. CLEANED, TREATED AND PRIMED REPAIR PARTS IAW SRM 51-1-8B. INSTALLED REPAIR PARTS IAW SRM 53-2-0 FIG 2 SHEET 5, 6, 7, 8. TORQUED IAW SRM 51-3-1.