As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
NR 2 MAIN TANK FWD FITTING CRACKED BETWEEN STA XRS 74.000 AND S-51 (MAJOR REPAIR). PERFORMED MAJOR REPAIR IAW SRM 57-1-0 PG 1. REMOVED CRACKED FITTING IAW SRM 57-1-0 PG 1 SRM 51-1-20D. CLEANED APPLIED POLYURETHANE TOP YELLOW COATING TO AREA IAW SRM 51-1-12 PG 7. INSTALLED NEW FITTING IAW SRM 51-1-12 SRM 51-3-0 SRM 51-1-23 (PLI-WASHER) SRM 51-1-20D SRM 51-3-1 (TORQUE) REFER TO NR 107160 FOR LEAK CHECK.