What was found
AT C-CHECK, RT WING I/B FLAP VANE DELAMINATED. REMOVED VANE, REPAIRED AND REINSTALLED PER M/M 27-51-14.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT C-CHECK, RT WING I/B FLAP VANE DELAMINATED. REMOVED VANE, REPAIRED AND REINSTALLED PER M/M 27-51-14.