What was found
AT C-CHECK, COMPLETE PERMANENT REPAIR AT XCW 69.5 HOLE INTERIM REPAIR. RAISED AND SHORED A/C. REMOVED FITTING, DOUBLER AND TRIPLER. INSTALLED DOUBLER, TRIPLER AND FITTING PER SRM 51-3-2. REINSTALLED STRUCTURAL COMPONENTS, SEALED ALL FASTENERS AND LEAK CHECK AREA. INSTALLED SKIN SECTIONS PREVIOUSLY REMOVED TO FACILITATE MAINTENANCE. RETORQUED BOLTS PER SRM 51-3-0. N/R 27