As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING A SCHEDULED MAINTENANCE VISIT WHILE PERFORMING AD 2002-01-23 A CRACK WAS DISCOVERED ON THE LT ENGINE CARRY THROUGH MOUNT BRACKET. THE LT ENGINE WAS REMOVED, AND THE LT AFT CARRY THROUGH BRACKET WAS REPLACED REFERENCING RAYTHEON ENGINEERING DRAWING 128-4035. THE SAME ENGINE WAS INSTALLED AND THE AIRCRAFT WAS RETURNED TO SERVICE.