What was found
THE C-HYDRAULIC SYSTEM FELL TO .25 FULL WHEN GEAR EXTENDED. FOUND LT MLG PHASE CONTROL VALVE, PRIORITY VALVE END CAP SHEARED. REPLACED PRIORITY VALVE, LEAK CHECK OK.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
THE C-HYDRAULIC SYSTEM FELL TO .25 FULL WHEN GEAR EXTENDED. FOUND LT MLG PHASE CONTROL VALVE, PRIORITY VALVE END CAP SHEARED. REPLACED PRIORITY VALVE, LEAK CHECK OK.