What was found
DURING APPROACH THE (FLAP FAIL) CAS AND FLAPS STUCK AT APPROX. 4 DEGREES, SLAT NORMAL. REMOVED AND REPLACED THE LEFT HAND NR 4 ACTUATOR & GEARBOX WITH OVERHAULED UNIT, OPERATIONAL CHECKS WERE SATISFACTORY. ALL WORK WAS PERFORMED IAW CESSNA CITATION 750 MAINTENANCE MANUAL CHAPTER 27-52-00.