Service difficulty report · Hydraulic System · Amd FALCON2000

Difficulty date
August 25, 2005
Submitted
August 29, 2005
Operation
Air carrier
Aircraft
N277QS
Make and model
Amd FALCON2000
Aircraft serial
177
Aircraft time
3,486 hours, 2,128 cycles
Part
Hydraulic System
Condition
Leaking
Location
Nr 1
Stage of operation
CR
How discovered
O
Nature of condition
K, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

COMPLETE LOSS OF THE NR 1 HYDRAULIC SYSTEM IN FLIGHT AT FL410. HYD QTY DROPPED TO 15 PERCENT, PRESSURE FELL TO 100PSI. UPON LANDING HYDRAULIC FLUID NOTED ALL OVER BELLY OF ACFT AND COVERING INSIDE OF "HELLHOLE" COMPLIED WITH NORMAL AND ABNORMAL CHECKLIST PER AFM.