Service difficulty report · Controller · Cessna 750

Difficulty date
February 20, 2006
Submitted
February 23, 2006
Operation
Air carrier
Aircraft
N955QS
Make and model
Cessna 750
Aircraft serial
7500055
Aircraft time
6,855 hours, 4,343 cycles
Part
Controller
Condition
Malfunctioned
Location
Te Flaps
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFTER TAKEOFF, ONCE THE FLAP RETRACTION SEQUENCE HAD COMPLETED, THE AMBER MESSAGE "FLAPS FAIL" ILLUMINATED. ABNORMAL CHECKLIST PROCEDURES WERE COMPLIED WITH (FLAP RESET BUTTON), MESSAGE DID NOT CLEAR. FOUND FLAP CONTROLLER HAVE FAULTS. RESET FLAP CONTROLLER AND PERFORMED FLAP OPERATIONAL TEST IAW 750 MM CHAPTER 27-50-00. OPS FOUND NORMAL.

More about the Cessna 750