What was found
NR 2 ENGINE, N1 INDICATION OF 100.3 YELLOW AND VERY QUICKLY WENT TO 100.3 RED. TAKEOFF ABORTED. PERFORMED BOTH ENG DOWNLOADS, REMOVED AND REPLACED NR 2 TOP AND BIM COWLING TO GAIN ACCESS TO N1 COMPENSATOR, WAS REPROGAMED NR 2 ENG N1 COMPENATOR FROM -7 TO -8 TEST RAN NR 2 ENG, PERFORMED DOWNLOAD, NO FAULTS FOUND ALL WORK PERFORMED IAW LMM 76-10-03.