Service difficulty report · Elevator System · Cessna 750

Difficulty date
March 31, 2010
Submitted
April 1, 2010
Operation
Air carrier
Aircraft
N975QS
Make and model
Cessna 750
Aircraft serial
7500175
Aircraft time
8,010 hours, 4,843 cycles
Engine
Allsn AE3007C
Part
Elevator System
Condition
Malfunctioned
Location
Flt Controls
Stage of operation
CL
How discovered
O
Nature of condition
F
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

PRIOR TO V1 ACFT NOSE BEGAN TO LIFT OFF GROUND, AND BY VR AIRCRAFT WAS ROTATING ON ITS OWN TOWARD GO-AROUND SET COMMAND BARS. REQUIRED EXCESSIVE FWD NOSE DOWN TRIM DURING CLIMBOUT. NOTICED ON LANDING THAT INSTEAD OF THE USUAL -5.5 TRIM I USED -4.7. PERFORMED ACFT WEIGH JOB IAW THE MM CHAPTER 8-10-00. PERFORMED AIRSPEED CALIBRATION CHECK IAW THE MM CHAPTER 34-11-08, LEAK AND OPS CHECK NORMAL. PERFORMED HORIZ STAB TRIM SYS - ADJUSTMENT TEST IAW THE MM CHAPT 27-40-00. OPS AND TRAVEL CHECKS WERE NORMAL.

More about the Cessna 750