ON DEPARTURE CLIMBING THROUGH 1000, FLASHING HYD PRESS WITH MASTER CAUTION. FLAPS STOPPED RETRACTING AT 7 WITH THE HANDLE IN FLAPS 0 POSITION. PERFORMED HYD QRH CHECKLIST. REMOVED LT FLAP ACTUATOR IAW MM 27-51-04. INSTALLED A REPAIRED FLAP ACT IAW MM 27-51-04 WITH NEW HARDWARE. WIRED LT FLAP ACTUATOR UP LIMIT SWITCH. ALL WORK IAW MANUAL 20-30-25. SPLICED X2 LT UP LIMIT SWITCH WIRING. INSTALLED & SAFTIED LT FLAP ACTUATOR ROD END. COMPLIED WITH LT FLAP ACTUATOR LOCKING PRESSURE ADJUSTMENT & FLAP INTERCONNECT LOOP CABLE ADJUST CHECK IAW MM 27-51-00, & MM 27-51-04. OPS FLAPS THRU CYCLES, ALL INDICATIONS NORMAL, NO HYD LEAKS NOTED, TRAVEL CHKS GOOD. VERIFIED LT ACT MAINT, SAFETIES, RIGGING & OPS CHECKS.