What was found
IN THE CLIMB OUT, 12000' , POWER AT ABOUT 88 %, RECEIVED A R BLEED LEAK, FOLLOWED THE R BLEED LEAK QRH, XBLEED WAS ALREADY CLOSED, R BLEED SELECTED OFF, L BLEED WAS ON, APU BLEED WAS OFF. MESSAGE WENT AWAY. CHECKED ROUTING OF THE BLEED LOOPS AS REQUESTED BY CRC, FOUND THE RH MT40 LOOP COMING CLOSE TO VENT HOLES ON THE RH INTERMEDIATE PRESSURE VALVE. RE-ROUTED THE BLEED LOOP AWAY FROM THE VENT HOLES. PERFORMED HIGH POWER ENGINE RUNS. OPS CHECK IS GOOD WITH NO CAS MESSAGE. WORK DONE IN REF TO AMM 36-21-00.