What was found
A LAV SERVICE VEHICLE IMPACTED THE RIGHT ENGINE WHILE MANEUVERING TO SERVICE THE LAV PERFORMED PRELIMINARY INSPECTION OF DAMAGE TO RIGHT COWL. 2 ENGINE 1 MEASUREMENTS SENT TO MCC JT 03/23/25 TOOK PICTURES AND MEASURETS ,SENT TO MCC AND AQRD FINAL RFTS HAS YOU PUT ADHESIVE IN DELAMLNATFON AND SAND.PARTS ON ORDER ETA21DO 3/24/25 PERFORMED TEMPOARY REPAIR TO RIGHT ENGINE COWL FN ACCORDANCE WITH RFTS-113376 REV O DATED 24MAR2025.