What was found
FLAP FAILED BETWEEN 1 AND 2. REVIEWED PREVIOUS STEPS AND PROCEEDED WITH THE FOLLOWING: SWAPPED FCE 1 & 2. PERFORMED RIGGING OF FLAP SYSTEM FOR FCE 1 AND PERFORMED OPS CHECKS OF FLAP SYSTEM S TIMES IAW AMM. WORK DONE IAW EMB-505 AMM 27-50-00. PERFORMED RIGGING OF MULTIFUCNTION SPOILER SYS & OPS CHECKS OF SPOILER SYSTEM 5 TIMES AS REQUIRED BY AMM. WORK DONE IAW EMB-505 AMM 27-60-00. PERFORMED OPS CHECKS OF OPS CHECKS OF PITCH TRIM 5 TIMES AS REQUIRED BY AMM. WORK DONE IAW EMB-505 AMM 27-40-00. PERFORMED OPS CHECKS OF THE PRESSURIZATION SYSTEM AS REQUIRED BY AMM IAW AMM 21-31-00. ALL OPS & RIGGING GOOD. RETURNED TO AIRCRAFT TO ORIGNAL CONFIGURATION.