What was found
STA SEA - NOSE LANDING GEAR DID NOT EXTEND WHEN SELECTED DOWN AT PASI, DIVERTED TO KSEA. EXTENDED NORMAL WHEN AT KSEA. FOUND EXCESSIVE MOISTURE IN SEVERAL LUBE POINTS AND CONTROL VALVE CABLES. LUBED ALL GEAR LUBE POINTS AND CONTROL CABLES. LAST SCHEDULED LUBE OF NOSE GEAR WAS 7-9-96 AT 45227.0 TAT AT THE EVERGREEN AIR CENTER, MZJ. NEXT DUE 45944.0 TAT. THIS OCCURRED 351.7 HOURS INTO A 717 LUBE CYCLE. (X)