What was found
ACCOMPLISHMENT OF ROUTINE C-CHECK WORK CARD REVEALED CORROSION ON LOWER SURFACE OF MAIN CABIN FLOORBEAM AT BS 950C LBL 25. REMOVED CORROSION AND MATERIAL LOSS OF LIMITS PER SRM 53-10-1. REMOVED DAMAGED AREA. FABRICATED REPAIR ANGLES AND FILLER PER SRM 53-10-8. TREATED AND PRIMED PER SRM 51-10-2 AND MM 51-20-2. INSTALLED REPAIR PER SRM 53-10-8 AND SRM 51-30-2. TT: 65,345:17 HOURS. TC: 43,816. (X)