What was found
DURING SCHEDULED INSPECTION, THE RIGHT AILERON CABLE WAS SEVERELY FRAYED. THE CABLE WAS RUBBING ON THE FLOOR PANEL AT BS 180.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED INSPECTION, THE RIGHT AILERON CABLE WAS SEVERELY FRAYED. THE CABLE WAS RUBBING ON THE FLOOR PANEL AT BS 180.