What was found
DURING C-7 CHECK, INSPECTION REPORTED CORROSION ON AILERON ACTUATOR REACTION LINK AROUND BEARING RETAINER AND A CRACK ON BEARING BOSS. MAINTENANCE REPLACED AILERON ACTUATOR REACTION LINK WITH NEW LOWER ASSY PER MM 27-11-101. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-7 CHECK, INSPECTION REPORTED CORROSION ON AILERON ACTUATOR REACTION LINK AROUND BEARING RETAINER AND A CRACK ON BEARING BOSS. MAINTENANCE REPLACED AILERON ACTUATOR REACTION LINK WITH NEW LOWER ASSY PER MM 27-11-101. (M)