What was found
DURING C-1 CHECK, INSPECTION REPORTED RUDDER PCU FAILED INTERNAL LEAK TEST. REPLACED RUDDER PCU. PERFORMED RIG CHECK PER MM 27-21-00 AND CHECKED GOOD. PERFORMED LEAK CHECK, NO LEAKAGE NOTED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-1 CHECK, INSPECTION REPORTED RUDDER PCU FAILED INTERNAL LEAK TEST. REPLACED RUDDER PCU. PERFORMED RIG CHECK PER MM 27-21-00 AND CHECKED GOOD. PERFORMED LEAK CHECK, NO LEAKAGE NOTED.