What was found
DURING C-2 CHECK, INSPECTION REPORTED LIGHT SURFACE CORROSION ON INTERCOSTAL BETWEEN STA 727B AND 727C. FABRICATED AND INSTALLED REPLACEMENT INTERCOSTAL PER SRM 51-30-02, 51-40-02 AND SOPM 20-41-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-2 CHECK, INSPECTION REPORTED LIGHT SURFACE CORROSION ON INTERCOSTAL BETWEEN STA 727B AND 727C. FABRICATED AND INSTALLED REPLACEMENT INTERCOSTAL PER SRM 51-30-02, 51-40-02 AND SOPM 20-41-02.