What was found
DURING C-2 CHECK, INSPECTION REPORTED CARGO TRACK AT STA 727A TO 727B, RBL 14, CORRODED AROUND NUT PLATE HOLES. REPLACED CARGO TRACK PER SRM 51-40-2 AND 51-10-2.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-2 CHECK, INSPECTION REPORTED CARGO TRACK AT STA 727A TO 727B, RBL 14, CORRODED AROUND NUT PLATE HOLES. REPLACED CARGO TRACK PER SRM 51-40-2 AND 51-10-2.