As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
ABORTED TAKEOFF. FLIGHT CREW REPORTED L/E FLAPS TRANSIT LIGHT ILLUMINATED WITH NR 2 SLAT ON OVERHEAD PANEL SHOWING INTRANSIT. TAKEOFF ABORTED AT 111 KIAS. REPLACED FLAP/SLAT MODULE PER MM 27-88-41. CHECKED TARGET TO EXTEND SENSORS ON NR 2, 3 AND 5 SLATS PER MM 27-88-11. CHECKED NORMAL. COMPLIED WITH HIGH ENERGY INSPECTION PER MM 05-51-07, PAGES 201-203 (5). COMPLIED WITH RTO INSPECTION PER MM 05-51-07 AND 22-88-41. OPERATIONAL TEST WAS NORMAL ON FLAP/SLAT SYSTEM.