NR 3 EPSU BATTERY (10WL) TEST FAILED. ACFT WAS GROUNDED. RESEATED ELECTRICAL CONNECTOR ON RIGHT ESCAPE SLIDE RAFT FIN (7501MM) IAW AMM SUBTASK 25-62-44-560-054-A STEP 2 (E). OPS CHECK GOOD NO DEFECTS NOTED. AC OK FOR SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 3 EPSU BATTERY (10WL) TEST FAILED. ACFT WAS GROUNDED. RESEATED ELECTRICAL CONNECTOR ON RIGHT ESCAPE SLIDE RAFT FIN (7501MM) IAW AMM SUBTASK 25-62-44-560-054-A STEP 2 (E). OPS CHECK GOOD NO DEFECTS NOTED. AC OK FOR SERVICE.