What was found
PAI - DURING C-CHECK, INSPECTION REPORTED CORROSION ON RT HORIZONTAL STABILIZER UPPER CHORD RIB AFT OF REAR SPAR AT BS 209.9. MAINTENANCE REMOVED DAMAGED AREA, FABRICATED REPLACEMENT PARTS AND REPAIRED PER SRM'S 51-10-2, 51-20-4, 51-30-2, AND 51-30-5. CYCLES: 1,941. (X)